2020 (November) – Little Mount Elizabeth

Final preparations of the tower foundation at Little Mount Elizabeth (SCCM-1) were completed in mid-September and required additional engineering. Once completed our team was able to pour the foundation and finish constructing the tower. Currently 2 of the 4 sites are operating at full capacity and the 3rd site requires final alignments and commissioning.